# Aisle and row sign schedule

One row per physical sign. Wayfinding only: hazard, egress and code-required signage
is specified separately by its own owner.

## Scheme

- Schedule ID / revision / date:
- Site, floor and room identifier:
- Grid or coordinate system the identifiers derive from:
- Direction numbering increases (state the reference, for example from the north wall):
- Words used for the two faces (must match the records):
- Colour used as reinforcement, if any:
- Scheme owner:

## Sign schedule

| Sign ID | Row or aisle identifier | Location (end of row, door, eye level) | Text line 1 | Text line 2 | Direction indicator | Range covered | Reading distance | Character height | Mounting height | Installed |
|---|---|---|---|---|---|---|---|---|---|---|
| | | | | | | | | | | |
| | | | | | | | | | | |

## Containment doors

| Door ID | Rows enclosed | Numbering direction | Closing expectation stated | Separate hazard signage present | Owner of that hazard signage |
|---|---|---|---|---|---|
| | | | | | |

## Legibility proof

| Sign ID | Read from (distance) | Lighting condition at test | Read by | Legible without stepping closer | Obstructions observed | Date |
|---|---|---|---|---|---|---|
| | | | | | | |

## Exceptions

| Sign ID | Issue (missing at one end, obstructed, wording differs from records, stale temperature) | Action | Owner | Closed |
|---|---|---|---|---|
| | | | | |

## Approval

- Scheme owner / date:
- Operations acceptance / date:
- Recorded in the site labeling standard (reference):
