# Corning: EDGE procedure

> Corning EDGE procedure S46998-A0007-P146, Issue 1, §§5.1–5.2, pages 19–23. Cover says December 2021; interior recordkeeping pages say February 2022. Equipment-specific hierarchy examples; mapping does not establish polarity.

Canonical page: https://datacenterlabeling.com/references/s07

Original source: [Corning: EDGE procedure](https://www.corning.com/catalog/coc/documents/standard-recommended-procedures/S46998-A0007-P146_EN.pdf)

## Scope of this source

Corning EDGE procedure S46998-A0007-P146, Issue 1, §§5.1–5.2, pages 19–23. Cover says December 2021; interior recordkeeping pages say February 2022. Equipment-specific hierarchy examples; mapping does not establish polarity.



Rackstamp provides editorial field guidance. IDs, cases, and worksheet entries are fictional examples unless identified otherwise. Distinguish local conventions from adopted standards. Source notes describe the evidence scope; a linked overview is not the full standard or a project approval.

## Related guidance

- [Fiber trunks and breakout legs are ambiguous](https://datacenterlabeling.com/problems/fiber-trunk-breakout-map)
